OEM / ODM Services

Your Drawing to Our Shipping Container: A 9-Step OEM Process

Every OEM project is different, but the path is not a mystery. Here is exactly what happens between your first drawing and the container leaving our port — who does what, and how long each step takes.

9 steps3 phasesQuotation in ~3 working days
Final inspection and assembly line at the Jasional LED lamp factory
From tooling to final inspection — every order is built in our Dongguan plants.

The big picture

Three phases, nine steps

Each phase ends with something you can hold and approve. Nothing moves forward without your written go-ahead.

01

Design & Confirm

Steps 1–3 · Quotation in ~3 working days

You send drawings, functions and target market. We confirm feasibility, safety standards and price before any tooling starts.

View steps 1–3
02

Prototype & Tooling

Steps 4–7 · T0 samples in ~25–45 working days

Structure and PCBA design run in parallel, a 3D prototype is tested, then the mold is cut and samples are approved by you.

View steps 4–7
03

Produce & Deliver

Steps 8–9 · Mass production in ~30–45 working days

Pilot run, mass production with 100% ageing test, final inspection and shipping under your agreed Incoterms.

View steps 8–9
1Design & Confirm~3 working days
2Prototype & Tooling~25–45 working days
3Produce & Deliver~30–45 working days

Phase 1 — Design & Confirm

Step 1

Requirement Review

Share your drawings (RD files accepted), functional requirements, target quantity and target market. Telling us the market up front lets us confirm the right safety standards — such as EN IEC 62368-1 and EN 50663 for Europe, or FCC for the US — before we design anything, because compliance drives structure and material choices.

What we need from you
  • 2D / 3D drawings, product photos or a competitor sample
  • Functional and photometric requirements
  • Target market and required certifications
  • Estimated quantity, target price and timeline
Step 2

Feasibility Check & Preliminary Quotation

Our engineering, tooling and purchasing teams review the structure, electronics and compliance requirements together, then issue a preliminary quotation covering tooling, unit price and MOQ.

Timeline: about 3 working days

Preliminary quotation sheet listing tooling cost, unit price and MOQ
A preliminary quotation covers tooling, unit price and MOQ.
Step 3

Confirmation, Contract & Deposit

You confirm the proposal in writing. We then sign the agreement and collect the tooling fee or deposit. Tooling work starts only after this step — so nothing is committed on your side before you have seen the plan and the price.

Business agreement confirmed with a handshake after the proposal is approved
Tooling starts only after written confirmation and deposit.

Phase 2 — Prototype & Tooling

Step 4

Structural & PCBA Design (in parallel)

Mechanical design and PCBA design run in parallel to save time. The driver, dimming, colour temperature control and any smart features are defined together with the mechanical structure.

Timeline: mechanical design ~7 working days · PCBA design ~12–18 working days

3D CAD model of an LED desk lamp open in structural design software
Structural and PCBA design run in parallel to shorten lead time.
Step 5

3D-Printed Prototype & Functional Testing

We print a 3D prototype, assemble it, and run fit checks plus electrical and photometric tests — power consumption, lumens, CRI, CCT and flicker — before any mold is cut. Finding a problem here costs a reprint; finding it after tooling costs a mold.

Integrating sphere photometric test measuring lumens, CRI, CCT and flicker
Photometric testing with an integrating sphere before tooling.
Step 6

Mold Design & First Mold Samples (T0)

Mold design and tooling begin, followed by T0 — the first shot of parts from the new mold. T0 parts are inspected for dimensions, fit and appearance, then assembled and tested.

Timeline: about 25–45 working days, depending on structure complexity

Close-up of T0 first-shot LED module parts after mold fabrication
T0 parts are checked for dimensions, fit and appearance.
Step 7

Sample Approval (Design Lock)

T0/T1 samples are sent to you with a test report. Your written approval locks the design. Any change after approval is handled as a change order, with its own cost and schedule impact — this is what keeps both sides protected.

Approved LED desk lamp sample ready for design lock
Written sample approval locks the design for production.

Phase 3 — Produce & Deliver

Step 8

Pilot Run & Mass Production

A pilot batch validates the production line and the packing method, then mass production follows. Every unit goes through an ageing test before packing.

Timeline: about 30–45 working days after sample approval and receipt of deposit

Packing line for LED desk lamps during mass production
A pilot run validates the line before full mass production.
Step 9

Inspection & Shipping

Final inspection (AQL sampling or 100% check as agreed), packing, export documentation, booking and loading. We support third-party inspection (SGS, TÜV, BV) on request.

Note: ocean or air transit time is quoted separately, based on your Incoterms and destination port.

Final inspection of LED lamps on the production line before shipment
Final inspection before packing and export documentation.

FAQ

Frequently Asked Questions

What is the minimum order quantity?

MOQ depends on the series and whether tooling is required. For existing models it is typically discussed per project; for fully custom structures, MOQ is set during the feasibility stage because tooling cost is amortized over the production volume.

Who owns the mold?

Ownership is defined in the agreement. Where the customer pays the tooling fee, the mold is normally the customer's property, with storage and handover terms stated in the contract.

Can you handle safety certification?

Yes. We confirm the required standards at Step 1 and can arrange testing and reports accordingly. Test reports are provided with the samples and can be referenced in your import documentation.

Do you ship to my country?

We export under EXW, FOB, CIF and DDP terms depending on the project. Tell us your destination port and preferred Incoterms and we will quote the freight separately.

Start a project

Have a drawing, or just an idea?

Send us the function you want and the market you sell in. You will get a feasibility opinion and a preliminary quotation within 3 working days.