Design & Confirm
You send drawings, functions and target market. We confirm feasibility, safety standards and price before any tooling starts.
View steps 1–3OEM / ODM Services
Every OEM project is different, but the path is not a mystery. Here is exactly what happens between your first drawing and the container leaving our port — who does what, and how long each step takes.
The big picture
Each phase ends with something you can hold and approve. Nothing moves forward without your written go-ahead.
You send drawings, functions and target market. We confirm feasibility, safety standards and price before any tooling starts.
View steps 1–3Structure and PCBA design run in parallel, a 3D prototype is tested, then the mold is cut and samples are approved by you.
View steps 4–7Pilot run, mass production with 100% ageing test, final inspection and shipping under your agreed Incoterms.
View steps 8–9Share your drawings (RD files accepted), functional requirements, target quantity and target market. Telling us the market up front lets us confirm the right safety standards — such as EN IEC 62368-1 and EN 50663 for Europe, or FCC for the US — before we design anything, because compliance drives structure and material choices.
Our engineering, tooling and purchasing teams review the structure, electronics and compliance requirements together, then issue a preliminary quotation covering tooling, unit price and MOQ.
Timeline: about 3 working days
You confirm the proposal in writing. We then sign the agreement and collect the tooling fee or deposit. Tooling work starts only after this step — so nothing is committed on your side before you have seen the plan and the price.
Mechanical design and PCBA design run in parallel to save time. The driver, dimming, colour temperature control and any smart features are defined together with the mechanical structure.
Timeline: mechanical design ~7 working days · PCBA design ~12–18 working days
We print a 3D prototype, assemble it, and run fit checks plus electrical and photometric tests — power consumption, lumens, CRI, CCT and flicker — before any mold is cut. Finding a problem here costs a reprint; finding it after tooling costs a mold.
Mold design and tooling begin, followed by T0 — the first shot of parts from the new mold. T0 parts are inspected for dimensions, fit and appearance, then assembled and tested.
Timeline: about 25–45 working days, depending on structure complexity
T0/T1 samples are sent to you with a test report. Your written approval locks the design. Any change after approval is handled as a change order, with its own cost and schedule impact — this is what keeps both sides protected.
A pilot batch validates the production line and the packing method, then mass production follows. Every unit goes through an ageing test before packing.
Timeline: about 30–45 working days after sample approval and receipt of deposit
Final inspection (AQL sampling or 100% check as agreed), packing, export documentation, booking and loading. We support third-party inspection (SGS, TÜV, BV) on request.
Note: ocean or air transit time is quoted separately, based on your Incoterms and destination port.
FAQ
MOQ depends on the series and whether tooling is required. For existing models it is typically discussed per project; for fully custom structures, MOQ is set during the feasibility stage because tooling cost is amortized over the production volume.
Ownership is defined in the agreement. Where the customer pays the tooling fee, the mold is normally the customer's property, with storage and handover terms stated in the contract.
Yes. We confirm the required standards at Step 1 and can arrange testing and reports accordingly. Test reports are provided with the samples and can be referenced in your import documentation.
We export under EXW, FOB, CIF and DDP terms depending on the project. Tell us your destination port and preferred Incoterms and we will quote the freight separately.
Start a project
Send us the function you want and the market you sell in. You will get a feasibility opinion and a preliminary quotation within 3 working days.
Or email us at rain@zwlamp.com
Talk to our sales team
Mon–Sat, 08:30–18:00 (GMT+8). We reply within one working day.